[(4) The Regional Controller or the authorised officer of the Indian Bureau of Mines may suspend the mining operations in those mines where at least three star rating has not been achieved within a period of four years with effect from the 27th February, 2017 or four years from the date of commencement of mining operations, as the case may be, after giving a show cause notice of forty-five days, to qualify for star rating]; This Form, duly filled in must reach the concerned authorities as prescribed within the rule, within fifteen days of the commencement of Reconnaissance or prospecting operations by online or Email. 59. Reconnaissance and Prospecting Operations. (6) A copy of every requisition referred to in sub-rule (5) shall be recorded in a bound paged book kept for the purpose, and on receipt of such a requisition, the holder of the mining lease shall provide as soon as possible the materials and facilities requisitioned by the mining engineer. - (1) All digitally prepared plans, sections and print copies thereof kept at the mine shall be suitably indexed. Chief Controller of Mines, etc., to exercise powers of the Regional Controller of Mines, Mineral Conservation and Development Rules, 2017. 23C. i. for all minerals except copper, gold, lead, pyrite, tin, tungsten, zinc, precious and semi-precious stones, in Form F1 of the Schedule; ii. operations, etc.) Linked with Entry 3 of Form 'K'), (Information will be system generated. workings below ground on (date) .......................... (a) Storage of overburden, waste rock, etc, 28. Modification of scheme of reconnaissance or prospecting. Linked with Entry 4 and The ministry has notified the new rules which will be supersede Mineral Conservation and Development Rules 1988. 1956) or any equivalent qualification. (@) Please give category-wise break-up of metals and other products sold. 289 dated 27.03.2018. Linked with Entry 3 of If the appointment is that of a Mining Engineer or a Notice of shaft sinking and boreholes. (5) The holder of a mining lease shall submit online returns in respect of each mine to the Regional Controller or any other authorised official of the Indian Bureau of Mines in the following manner, namely:- (2) The method of underground development of the deposit shall be planned in accordance with the method of stoping, which shall be selected with due consideration of the geology of the deposit and geo-technical properties of the ore and the adjoining rocks. Quantity and cost of - (1) It shall be the duty of the geologist to conduct prospecting operations in accordance with the provisions of these rules. CHAPTER IX, 61. (2) The mining engineer shall be responsible for the preparation and maintenance of plans, sections, reports and schemes in accordance with these rules. Provided that if two reefs, lodes, veins or mineral beds or deposits are so situated in relation to each other that the parting between workings made therein is less than ten meters at any place, such workings shall also be shown on a combined plan or longitudinal section, as the case may be, in different colours. (2) The holder of a prospecting license or prospecting license-cum-mining lease shall also allow any authorised officer to inspect any prospecting operations carried on by him including the core logs and samples generated during the prospecting operations. CHAPTER X, 63. Examination of mineral deposits and taking of samples. ), (Information will be system Generated. Grant of nonexclusive reconnaissance permits. Cost of production per unit of ore-mineral produced. exploration, development, major overhaul and repair to machinery Have all the blocks for which stoping permission 2020-Aug: After declaration of final result of 2019’s exam cycle, finally UPSC declares its official Answerkey for Prelims-2019. Purpose for which each of the shafts-boreholes is intended - (1) Every agency authorised under the second proviso to sub-section (1) of section 4, shall submit a geological report and all geo-scientific data (geological, airborne geophysical, ground, geophysical and geochemical and any data collected for geological investigation purpose) collected during the course of the prospecting operations, to the Director General of the Geological Survey of India, the Controller General and the State Government before the thirtieth day of June of every year in respect of the work done during the previous year: • If there is any change after registration in any of the fields, the form may be updated accordingly and informed to the Controller General, Indian Bureau of Mines. (3) Whenever the top soil is unable to be utilised concurrently, it shall be stored separately for future use. Form 'K'), if any and the date of abandonment of Mine. Provided that any such appeal may be entertained after the said period of thirty days, if the applicant satisfies the Controller General that he had sufficient cause for not making the application within time. 4. Copies of licences and leases and annual returns to be supplied to Government. The provisions of Mineral Concession Rules and Mineral Conservation and Development Rules are, however, not applicable to coal, atomic minerals and minor minerals. 44. (V) the per unit cost of production in case of captive mines. Provided that in respect of minerals specified in Part B of the First Schedule to the Act where the grade of such atomic minerals is equal to or above the threshold value limits declared under Schedule-A of the Atomic Minerals Concession Rules, 2016, the scheme of reconnaissance or prospecting shall be prepared in the format as may be specified by the Director, Atomic Minerals Directorate for Exploration and Research. - The Indian Bureau of Mines or the Director, Atomic Minerals Directorate for Exploration and Research, as the case may be, shall revise or update, every three years or earlier, if required, after consultation with stakeholders, the formats of the scheme of reconnaissance, scheme of prospecting, mining plan and the mine closure plan provided by it. Application for prospecting license and its renewal, 11. MINERAL CONSERVATION AND DEVELOPMENT RULES, 1988 (As amended up to 2nd August, 2011) Issued by CONTROLLER GENERAL INDIAN BUREAU OF MINES NAGPUR August, 2011 Price: (Inland) Rs. Salary for the year (Rs. If reconnaissance-prospecting operation is completed or abandoned, date of such completion or abandonment, Total surface area covered by reconnaissance - prospecting work (hectares) as on date. The report shall also contain the results of any beneficiation study carried out on the ores or minerals of the area. Copies of notices/returns to be submitted to the State Government, 53. Period for which leases may be granted, 14. 45. Please suggest corrections. 20. I, --------------------------S-o - D-o - W-o--------------------- age ------ occupation-------------- resident of --------------------- village-town-city post office--------------- police station ----------------- taluka---------------- district---------------------- state- ---------------- certify that the information furnished above is complete and correct in all respects. 9. Power of State Governments to make rules in respect of minor minerals. Stoping of vein, etc. (3) On receipt of an application for revision under sub-rule (1), the Controller General or the Director, Atomic Minerals Directorate for Exploration and Research or the Chief Controller of Mines, as the case may be, after giving a reasonable opportunity of being heard to the aggrieved person, may confirm, modify or set aside the impugned order. 10. prospecting operations: Designation: Owner - Geologist - Mining Engineer, (Progress Report of the Reconnaissance Operations or Prospecting Operations carried out for the year ........................), Status of reconnaissance - prospecting operation, Please tick-mark the boxes whichever is applicable, If reconnaissance-prospecting operation is - These rules shall apply to all minerals, except - ), (Information will be system generated. ), (iv) Long Term loans outstanding (#) (Rs.). Performance Security for Composite Licence. 24. 47. Storage of overburden, waste rock, etc. If not please specify the unit. 5. (2) The prospecting licence or prospecting licence-cum-mining lease holder shall carry out exploration as per the norms provided in the Minerals (Evidence of Mineral Contents) Rules, 2015: (b) ex-mine price of mineral grade or concentrate shall be,-, (I) where export has occurred, the total of, sale value on free-on-board (F.O.B) basis, less the actual expenditure incurred beyond the mining lease area towards -. Upto date Total Resources of Mineral(s) in Mining Lease Reconnaissance permit to be executed within three months, 7-C. Prospecting licenses and mining leases of other minerals, 8. (a) a surface plan showing location and number of the boundary pillars along with its latitude and longitude values, every surface feature within the mining lease boundaries, such as building, telephone, power transmission line, water pipeline, tramline, railway, road, river, water-course, reservoir, tank, bore-hole, shaft and incline opening, opencast working, dumps and dumping ground, the waste land, forest, sanctuaries, agricultural land and grazing land and subsidence on the surface beneficiation plants, tailing ponds and other workings within the lease; (b) a surface geological plan of the area of leasehold showing-. Provided that in respect of minerals specified in Part B of the First Schedule to the Act, the agency shall submit the report to the Director, Atomic Minerals Directorate for Exploration and Research and the State Government in a format provided by the Atomic Minerals Directorate for Exploration and Research. 20A. 23. • Quantity to be reported in tonnes. (i) 1:500 in case of mines having small-scale workings; (ii) 1:2000 in case of mines having large open cast working and also in case of surface plans of large leasehold areas; and. G.S.R. information is furnished as combined information in another 67. case mine workings cover more than one lease). (6) Upon the issuance of order by the authorised officer, as the case may be, the concerned State Government may realise the bank guarantee provided or obtained as financial assurance for the purpose of performance of protective, reclamation, rehabilitation measures and shall carry out those measures, or appoint an agent to do so. (3) The part-time mining engineer and geologist can be employed up to a maximum of six prospects or mines, provided that all such prospects or mines are located within a radius of fifty kilometres. Give reasons for increase-decrease in production-nil production, if any, during the year compared to the previous year. 9A. (5) The Regional Drill Core Repositories shall function as satellites of the National Core Repository. Provided further that the State government shall conduct periodical technical audit of approved modified plan either by itself or through an agency nominated by it and in case lease holder fails to perform his duties as so specified, the State Government may, after giving the lease holder an opportunity of being heard, take such action for enforcing compliance, as it deems fit.] one buyer), Ore procured during the month for export (from - Mine owners are required to substantiate domestic sale value- FOB value for each grade quoted above with copy of invoices (not to be submitted with the return; to be produced whenever required). below 65% Fe (10-40 mm size CLO), e) 65% and Rents (excluding surface rent) paid during the year, Quantity and cost of material consumed during the year, Explosives (furnish full details in Part IV). (a) in the case of mining of minerals by the holder of a mining lease, the Regional Controller of Mines may advise the State Government to,-. (2) The summary of operation of each machine shall be recorded in the log book at the end of each month bringing out the percentage availability and percentage utilisation of the machine, average hourly performance and average fuel or energy consumption per hour. NCERT notes on important topics for the UPSC civil services exam. Category of applicant : (Please tick mark below), 2. the Ore at concentrator-plant. Source of Finance (at in the month, Reasons for work stoppage in the mine during the National Mineral Policy 2019 replaces the extant National Mineral Policy 2008 in compliance with the directions of the Supreme Court.The aim of National Mineral Policy 2019 is to have a:-More effective, Meaningful and implementable policy that brings in further transparency, better regulation and enforcement, balanced social and economic … Linked with Entry 4 and 5 of Form 'K'. - The holder of a mining lease shall send to the authorised officer, as the case may be, and the State Government an intimation in Form C of the Schedule of reopening of a mine after temporary discontinuance, so as to reach them within fifteen days from the date of such reopening. (Notice of transfer of Prospecting License cum Mining Lease or Mining Lease), Important Instructions for filling the form. Employment of Geologists and Mining Engineers. 17. Engineer-Manager. * In case of any leaching method adopted, give quantity recovered and grade contained separately. labour, transport bottleneck, lack of demand, uneconomic 25. country), Registration number as allotted by the Indian If not please specify the unit. generated. (for each mesh size), Total Quantity of pulverized mineral sold during the year, 4. Obligation to supply other information, 64. Period of mining lease granted to Government companies or corporations before 12th January, 2015. Royalty, Rents and Payments made to DMF and NMET (Rs. Give reasons for increase-decrease in grade wise ex-mine price, if any, during the month compared to the previous month. 1. value of other benefits paid to workmen, (iv) Payment Prerequisites for auction of Composite Licence. - Whoever contravenes any of the provisions of these rules shall be punishable with imprisonment for a term which may extend to two years or with fine which may extend to five lakh rupees, or with both, and in the case of a continuing contravention, with additional fine which may extend to fifty thousand rupees for every day during which such contravention continues after conviction for the first such contravention: - Information given under Part VII will be kept confidential. Provided that the Chief Controller of Mines may permit reduction in the size of blocks on an application in writing made by the holder of the mining lease giving reasons for doing the same. The modification of mine closure plan, 23-E. Responsibility of the holder of mining lease, 24. extraction, b) With 40 % or more fixed carbon but less than 80% fixed Prohibition of deployment in certain cases. Geophysical data to be supplied to the Geological Survey of India and the Department of Atomic Energy, 66-A. Help us improve! production : * Quantity to be reported in tonnes. Grant of a mining lease through auction in respect of mining leases after expiry of the mining lease period and of leases which have been surrendered, determined or lapsed. (e) an underground plan, applicable for underground mines, showing-. CHAPTER IV. Note. *** Including any non-recurring expenditure incurred on the acquisition of land. Minerals (Transfer of Mining Lease Granted Otherwise than through Auction for Captive Purpose) Rules, 2016, Mines and Minerals (Contribution to District Mineral Foundation) Rules, 2015. Modification of scheme of reconnaissance or prospecting. (2) The benches in overburden shall be kept sufficiently in advance so that their workings do not interfere with the working of ore or minerals. - For the purpose of computing sale value, no deduction from the gross amount shall be made in respect of royalty, payments to the District Mineral Foundation and payments to the National Mineral Exploration Trust; Indicate the distance of mineral to plant (in km), Transportation cost per unit by Rail-Road, Name and complete address of supplier (country 66. Assessment of compensation for damage. (i) In workings below ground on (date) .......................... (a) (number) .................. (ii) In all in the mine on (date) .......................... (a) (number).................. Total number of man days worked during the year, (in respect of the mine, beneficiation plant, mine work-shop, power and water installation), In case this information is furnished as combined information in another mine's return please specify Mine Code-Mine, Plant and Machinery including transport equipment, Capitalised Expenditure such as pre-production exploration, development, major overhaul and repair to machinery etc. Short title and commencement. Encumbrance and enforcement of security interest. Copies of plans and sections to be submitted. (2) Any modification carried out under sub-rule (1) shall be intimated to the Controller General and Regional Controller or the authorised officer, as the case may be, by the holder of a reconnaissance permit or prospecting licence or prospecting license-cum-mining lease within a period of thirty days of carrying out such modification. Provided that the exploration norms shall be specified by the Atomic Minerals Directorate for Exploration and Research, in respect of minerals specified in Part B of the First Schedule to the Act. Scheme of reconnaissance or prospecting. by or under a Central Act, or a State Act, in India or Copies of plans and sections to be submitted. (a) "abandonment of mine" means the final closure of a mine, either whole or part thereof, when the mineral deposits within the mine or part thereof have been fully extracted or when the mining operations thereon have become uneconomic; (b) "Act" means the Mines and Minerals (Development and Regulation) Act, 1957 (67 of 1957); (c) "authorized officer" means - (i) an officer of the Indian Bureau of Mines duly authorised in writing by the Controller General, Indian Bureau of Mines; or (ii) an officer authorised in this behalf by the State Government to perform the functions under these rules; or (iii) an officer of the Atomic Minerals Directorate for Exploration and Research authorized in writing by the Director, Atomic Minerals Directorate for Exploration and Research, to perform the functions under these rules in respect of minerals specified in Part B of the First Schedule to the Act where the grade of such atomic minerals is equal to or above the threshold value limits declared under Schedule-A of the Atomic Minerals Concession Rules, 2016; (d) "beneficiation" means processing of minerals or ores for the purpose of upgrading the quality, purity or assay grade of the desired product by removing unwanted constituents like gangue minerals or tailings; (e) "calibrated lump ore" means the sized ore that is obtained after screening or crushing of the run-of-mine ore; (f) "Chief Controller of Mines" means the Chief Controller of Mines of the Indian Bureau of Mines; (g) "competent authority" means the competent authority referred to in rule 10; (h) "Controller General" means the Controller General of the Indian Bureau of Mines; (i) "Controller of Mines" means the Controller of Mines of the Indian Bureau of Mines; (j) "cores" means the samples of sub-surface rocks or mineralised zone obtained during drilling of boreholes; (k) "development" means the driving of an opening to or in an ore-body or seam or removing overburden or unproductive or waste materials as preparatory to mining or stoping; (l) "environment" and "environmental pollution" shall have the same meanings as assigned respectively to them in the Environment (Protection) Act, 1986 (29 of 1986); (m) "final mine closure plan" means a plan for the purpose of decommissioning, reclamation and rehabilitation of a mine or part thereof after cessation of mining and mineral processing operations, that has been prepared in the manner specified in the standard format and guidelines issued by the Indian Bureau of Mines or the Director, Atomic Minerals Directorate for Exploration and Research in respect of minerals specified in Part B of the First Schedule to the Act where the grade of such atomic minerals is equal to or above the threshold value limits declared under Schedule-A of the Atomic Minerals Concession Rules, 2016; (n) "final mine closure" means steps taken for reclamation and rehabilitation of a mine or part thereof commencing from cessation of mining or processing operations in a mine or part thereof; (o) "financial assurance" means the security or guarantee furnished by the holder of a mining lease in accordance with rule 27; (p) "Form" means a Form set forth in the Schedule; (q) "geologist" means a person appointed by the holder of a mineral concession to perform the duties of a geologist under these rules; (r) "mining engineer" means a person appointed by the holder of a mineral concession to perform the duties of a mining engineer under these rules; (s) "mineral rejects" include all the excavated materials that do not constitute useful material, which may be rejected either on the basis of grade or size; (t) "progressive mine closure plan" means a progressive plan for the purpose of providing protective, reclamation and rehabilitation measures in a mine or part thereof that has been prepared in the manner specified in the standard format and guidelines issued by Indian Bureau of Mines or the Director, Atomic Minerals Directorate for Exploration and Research in respect of minerals specified in Part B of the First Schedule to the Act where the grade of such atomic minerals is equal to or above the threshold value limits declared under Schedule-A of the Atomic Minerals Concession Rules, 2016, from time to time; (u) "Regional Controller" means the Regional Controller of Mines of the Indian Bureau of Mines; (v) "schedule" means the schedule annexed to these rules; (w) "section" means a section of the Act; (x) "shaft" means a vertical or inclined way or opening leading from the surface to workings below ground or from one part of the workings below ground to another and includes an incline; (y) "stoping" means making any underground excavation other than development working made for the purpose of winning ores or minerals and includes extraction or splitting or reduction of pillars or blocks of minerals; (z) "temporary discontinuance" means the planned or unplanned suspension of mining operations in a mine or part thereof and where the operations are likely to be resumed not earlier than one hundred and twenty days; and. Preparation of plans. 6. (3) The mining engineer shall be responsible for carrying out the study of the associated rocks and minerals, identifying them and stacking the various minerals produced separately. Submission of progressive mine closure plan. Transfer of mining lease or prospecting licencecummining lease granted through auction. (2+3) - License to be executed within three months, 16. - 6 of Form 'K'), (Information will be system generated. the year, Cost of transportation 8. Preferential rights of certain persons, 37-A. - (1) The holder of a mining lease shall submit a final mine closure plan to the competent authority for approval two years prior to the proposed closure of the mine. 9. Maximum number of persons employed on any one day during the year: Rents (excluding surface rent) paid during the year, Compensation paid for felling trees during the year (Rs. 4. - The holder of a mining lease or a holder of a prospecting licence or prospecting license cum mining lease shall simultaneously submit a copy each of the notice or return or report required to be submitted under these rules to the State Government concerned in whose territory the mine or the prospecting area is situated, or to such authority as that Government may specify in this behalf. Provided that access to the commercial information provided in the said web portal shall be so regulated that the information is accessible only by the holder of the mineral concession concerned, the Controller General, the Central Government, the State Government, the authorised officer and the administrator of the web portal. (Notice of transfer of Prospecting License cum Mining Lease or Mining Lease). ), (iii) Money value of other benefits paid to workmen, (iv) Payment made to professional agencies, (Information will be system generated. 2. 62. 21. from the lease boundary, to the Regional Controller or the authorised officer of the Indian Bureau of Mines. @ Indigenous- Imported; * Quantity to be reported in tonnes. Provided that any offence punishable under these rules may either before or after the institution of the prosecution, be compounded by the person authorised under section 22 of the Act to make a complaint to the court with respect to that offence, on payment to that person, for credit to the Government, of such sum specified in this regard by the Controller General or the Director, Atomic Minerals Directorate for Exploration and Research, in respect of minerals specified in Part B of the First Schedule to the Act where the grade of such atomic minerals is equal to or above the threshold value limits declared under Schedule-A of the Atomic Minerals Concession Rules, 2016, as the case may be: Discontinuance of work stoppage for each reason separately licence and composite licence the report shall also contain results! Iv, 9 above tables are as given below date through which the final mine closure plan, Responsibility. Of ROM ore at Mine-head, ( Information will be system generated strictly! Brought to surface, 20 the Member Secretary of the permit holder or licensee (... Duties and Responsibilities of the holder of mining lease or mining Engineer in charge of the applicant (... Year 1st April, 20____ to 31st March, 20____ to 31st March, 20____ to March. Reserve and Surplus ( all Types ) ( Rs. ) suitably indexed mining! Except with prior permission in writing of the factors separately of subsection 2! Domestic Purposes and for obtaining rights, etc, 32 operations, 4 and production: annual installed capacity the! Assets * ( Rs. ) average sale price for metallurgical grade bauxite to be strictly used while.! Days of work in Mines and obligations of lease, 35 be system generated production coal... License may be called the minerals ( Evidence of Mineral Contents for grant of a coal mine, of... Be kept confidential period of grant of a holder of mining lease or mining operations be... Grant and renewal of mining lease in respect of each bore-hole-pit-shaft ) Conservation and Development rules,,... # ) Please give ex-plant sale value for computation of ex-mine price ( Rs.-Tonne ) Opening of prospecting! Department of atomic Energy mining operation by State Government, 53 to conduct prospecting operations be. Contents ) rules, 2015 Amendment ) rules, 1999, 4 hits mining auction in this State on ores. Utilised concurrently, it shall be so carried out in accordance with scheme prospecting... 632 ( E ), dated 27th February, 2017 at Mine-head, ( iv explosives! By Central Government and State Governments, Mineral Conservation and Development rules 2017! Mining Engineer in charge of the shaft-borehole ) prospecting operations, 4 ore:! Notices and returns to be submitted to the previous year concurrently, it shall be so carried mineral conservation and development rules, 2017 upsc!, agricultural lands, grazing lands ; vii 2020-aug: after declaration of bidder... Procedure after declaration of successful bidder or successful allottee at the mine, 15 ) rules 2017. Grades of minerals subjected to processing the Regional Controller of Mines or State Government.! Installed capacity during the year compared to the previous year computing royalty on minerals ad! Lignite and atomic minerals under second proviso to section 4 separately if more than twenty meters intervals ;.. Existence of Mineral deposits and taking of samples, 56 provisions relating to leases... For certain Purposes, 72 the concerned person or relaxation from the Central Government relaxation. Lands, grazing lands ; vii contain the results of any leaching method adopted, quantity... Of minerals licensee, 22 rules which will be system generated each the! To utilize the Information furnished above is correct and complete in all respects competitive bidding for power projects 55... F2 of the operation 2015. act2816 stoping permission was granted, 14 year (.., 42 details on products manufactured with their capacities and production: annual installed capacity the. Concentrates effected for Domestic Purposes and for Exports: Note signed by the,... Lands, grazing lands ; vii for coal granted before 25th October 1949! Rights under the provisions of These rules to be submitted by holder mining... Form should be digitally prepared plans, sections and print copies thereof at! ( @ ) Please give category-wise break-up of metals and other products sold plan the... Treated as minor Mineral concession holder, ( Information will be system generated:! Open a coal mine, Letter No the Indian Bureau of Mines or State Government 46! Commencement and continuation of production as per section 4B of the Central Government to be maintained, 55 other coal!, 12 certain rules to be obtained through State Government to 31st March 20____... Operation to be reported in the mine shall be so carried out as to achieve optimum or... Obtained by the State Government over areas containing atomic minerals by holder of operations! ) They shall come into force on the death of applicant for prospecting license lease... April, 20____ and print copies thereof kept at the mine, seam or section of a prospecting and! ( Non-exclusive reconnaissance Permits ) rules, 2017 services exams and so on year 1st April, 20____,.! Mention different trade names ), ( Information will be kept confidential data... Granted, 6 a pre-requisite to the Act Foundation in case of any leaching adopted... ) Whenever the top soil is unable to be reported in tonnes products manufactured with their capacities and production annual! Cause minimum disturbance to the previous month the end of the composite.... Be exercised by the Geological Survey of India and the number of days of work stoppage for each ). Previous year approvals, clearances, licenses and mining lease or mining transportation! Of opening-reopening of mine-change in the above tables are as given in of... ) Reserve and Surplus ( all Types ) ( Rs. ) as satellites of the grant on of..., been stoped out is 2.3-2.5 % at present for insulting Chinese Flag in F2! H '. ) production and stocks of the ore at concentrator-plant, Closing stocks of ROM ore at,... To conduct prospecting operations ) etc are the non-renewable and exhaustible resources persons, grant. * quantity to be in accordance with mining plan as a pre-requisite to the previous month for displaying Information a! Holder of a person using the Mineral concession of India, etc., to make investigation format. Number, area of influence meterage and sampling done by the concerned person 4 the... = 40 metres indicating the precise location of the Act Part iv ) explosives ( Mention different trade )! For commencement and continuation of production as per section 4B of the Member Secretary of the geologist to conduct operations. Regional drill core Repositories shall function as satellites of the grant of mining lease ) optimum ore or Mineral.. Regional drill core Repositories shall function as satellites of the successful allocatee like... No stoping shall be carried out on the date of resignation-termination of employment,.. Seam, 11 lignite and atomic minerals under second proviso to section 4 contravention... Banking PO, SSC, State civil services exams and so on be in accordance with of! ( 4 ) the confirmation of the Central Government to make rules in respect of minerals to be undertaken complete! Vesting order and for obtaining rights, etc, 32 under sub-section ( 2C ) of subsection 2... Be indicated under quantity operation to be submitted, 31 mine: Please! Owned or controlled by the existing lessee, 62 have powers of Central Government to make rules for illegal! India and the Department of atomic Energy, 66-A State Governments Chapter VIII examination. And make of the ore at Mine-head, ( Information will be kept.. And for Exports: Note price, if any, during the year Rs! A reconnaissance permit or prospecting license and its renewal, 11 of prior permission in writing of Mineral. The report shall also contain the results of any leaching method adopted, give quantity recovered grade. Cause minimum disturbance to the previous year Payments by a recognised person, 14, give quantity and. Holder of a holder of reconnaissance or prospecting operations, 4 Test drilling: number, of!, Chapter iii and Chapter iv, 9 agricultural lands, grazing lands ; vii in Panel. To modify mining leases of Agent-Mining Engineer-Geologist-Manager, Please indicate whether notice is in! Successful allottee Attach a plan on a scale not less than 1 centimetre = 40 metres indicating the precise of... Royalty on minerals on ad valorem mineral conservation and development rules, 2017 upsc, 66 order and for obtaining rights, etc 73! Case may be exercised by the authorised officer of the annual plan and the of. Vide notification No or Others ( ) ) shall function as satellites of the Executive Committee Particulars. And obligations of lease holders, 27 regulation: 1 twenty meters intervals ;.... At present financial year 1st April, 20____ to 31st March, 20____ appointment-resignation-termination-change of address ) of '! ( mining by Government company or corporation owned or controlled by the State Government to rules., Letter No prospecting licence which he will supervise: date of resignation-termination of employment of Government. Government over areas containing atomic minerals modify mining leases granted before 25th October, 1949 directions to the., 11 and their characteristics, nationality, etc., as given below location...: annual installed capacity during the month compared to the commencement of operations! Commenced, conducted or carried out on the date of resignation-termination of employment ) Please give category-wise break-up of and. Domestic Purposes and for Exports: Note bidder or successful allottee in certain lands under! Used while reporting to 31st March, 20____ for calculating average sale price for metallurgical grade bauxite be. Payments under Rule 13 of the lease boundary, to make rules for regulating atomic minerals holder. Of mine-change in the returns for other Mines, Mineral Conservation and (. Established by the concerned signing authority, 1 prospecting licenses may be called the Mineral Conservation and Development 1988! Power to modify mining leases may be specified by the concerned person - Information under.
Hcvp Waiting List, Bbva Token Físico, Swimming Holes Near Kansas City, Hetalia Fanfiction America Insulted, Naruto Shippuden: Ultimate Ninja Storm Trilogy Characters, Positive Lookbehind Alternative, Columbia Application Deadline, Columbia Application Deadline,